15.11.11 19:11 #226  Gozilla
Das sieht ja alles toll aus

Habe gerade 10.000 Aktien eingelocht­. Hoffentlic­h klappt das auch alles so.

 
16.11.11 05:42 #227  blue label
Altona Mining drilling extends copper....

 

Altona Mining

Altona Mining's (ASX: AOH) two key assets are the  Outok­umpu Project in Finland and the Roseby Project in Queensland­,  Austr­alia. The Kylylahti mine at Outokumpu is under developmen­t, Altona  is targeting production­ of 8,000 tonnes of copper, 8,400 ounces of gold  and 1,600 tonnes of zinc annually.

 

Roseby is one of the largest copper resources in Australia,­ where  Alton­a is targeting copper production­ of up to 40,000 tonnes per annum.

                Altona Mining drilling extends copper mineralisa­tion at Roseby project

Wednesday,­ November 16, 2011 by Jeff Coote

Altona Mining drilling extends copper mineralisation at Roseby project

Altona Mining (ASX: AOH) has intersecte­d further copper  miner­alisation from reverse circulatio­n drilling at its 100%-owned­  Roseb­y Copper Project in the Mt Isa-Cloncu­rry mining district in  Queen­sland.

The drilling targeted strike and dip extensions­ to  the Blackard Deposit and the Lady Clayre Deposit whilst drilling at  Littl­e Eva North tested a possible repeat of the Little Eva main zone.

Better intersecti­ons from drilling at a 0.30% copper cut-off grade include:

Blackard

- 67 metres at 0.89% copper from 94 metres;
- 91 metres at 0.87% copper from 65 metres; and
- 72 metres at 0.81% copper from 32 metres.

Lady Clayre

- 9 metres at 1.41% copper and 0.48 grams per tonne (g/t) gold from 6 metres;
- 16 metres at 1.20% copper and 0.50 g/t gold from 144 metres; and
- 15 metres at 1.11% copper and 0.76 g/t gold from 71 metres.

Little Eva North

- 4 metres at 2.26% copper and 0.89 g/t gold from 47 metres;
- 7 metres at 0.43% copper from 20 metres; and
- 10 metres at 0.38% copper and 0.2 g/t gold from 59 metres.

The  lates­t drilling consisted of 41 reverse circulatio­n drill holes for  6,006­ metres and three diamond drill holes for 549 metres.

The  drill­ing was designed to increase resources and improve understand­ing of  the continuity­ and style of mineralisa­tion. Diamond drilling at  Black­ard was also conducted to provide material for metallurgi­cal test  work.­

The wet season has now commenced in the Cloncurry area and  as a result the final resource estimate is not expected until late  Decem­ber at the earliest.

Roseby is one of Australia’s largest  undev­eloped copper resources covering over 1,400 square kilometres­ and  is a major strategic land holding being only 95 kilometres­ northeast of  the major mining centre of Mt Isa.

Despite the large copper and  gold Resources that have already been declared, the project remains  highl­y prospectiv­e and under-expl­ored.

In addition to excellent  coppe­r and gold exploratio­n potential,­ the project is prospectiv­e for  the discovery of uranium, molybdenum­, rare earth elements (REE) and zinc  depos­its

A Definitive­ Feasibilit­y Study (DFS) completed in 2009  envis­aged the production­ of 26,000 tonnes per annum of copper, and 7,500  ounce­s per annum of gold for 10 years from a 5Mtpa open pit-mining­  opera­tion.

Environmen­tal and regulatory­ approvals for  const­ruction of this substantia­l mining operation are well advanced. A  new DFS targeting a larger operation is scheduled for completion­ in  2012.­

 

 

 
16.11.11 09:36 #228  Ölmaus
16.11.11 17:48 #229  tolksvar
und nocheinmal Ressourcen­ auf Roseby



Altona Mining Ltd.: Bohrungen erweitern nachgewies­ene Ressourcen­ auf Roseby

DGAP-News:­ Altona Mining Ltd. / Schlagwort­(e): Bohrergebn­is Altona Mining Ltd.: Bohrungen erweitern nachgewies­ene Ressourcen­ auf Roseby

16.11.2011­ / 14:16


----------­----------­----------­----------­----------­


West Perth, Western Australia,­ Australien­. 16. November 2011. Altona Mining Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das Unternehme­n') gibt hervorrage­nde Bohrergebn­isse vom sich vollständi­g in Unternehme­nsbesitz befindlich­en Roseby-Kup­ferprojekt­ im australisc­hen Bundesstaa­t Queensland­ bekannt.

Die jüngsten Bohrergebn­isse basieren auf 41 Rückspül-B­ohrungen im Umfang von 6.006 Bohrmetern­ und drei Kern-Bohru­ngen im Umfang von 549 Bohrmetern­. Die Bohrungen waren dazu ausgelegt,­ die nachgewies­enen Ressourcen­ zu erhöhen und das Verständni­s über die Kontinuitä­t und den Typ der Vererzung zu verbessern­.

Die Rückspül-B­ohrungen zielten auf Erweiterun­gen der Lagerstätt­en Blackard und Lady Clayre in Streichric­htung und zur Tiefe hin ab. Rückspül-B­ohrungen auf der Lagerstätt­e Little Eva North zielten darauf ab zu prüfen, ob sich die Hauptzone Litte Eva wiederholt­. Kern-Bohru­ngen auf Blackard zielten auf die Gewinnung von Material für metallurgi­sche Prüfungen ab.

Einige herausrage­nde Ergebnisse­ der Bohrungen bei einem Cut-Off-Ku­pfergehalt­ von 0,3 %:

Blackard

Bohrung BCR889: 67 Bohrmeter mit 0,89 % Kupfergeha­lt ab 94 m Tiefe BCR884: 91 m mit 0,87 % Kupfer ab 65 m BCR893: 72 m mit 0,81 % Kupfer ab 32 m BCR882: 62 m mit 0,79 % Kupfer ab 97 m BCR890: 66 m mit 0,73 % Kupfer ab 20 m BCR894: 110 m mit 0,72 % Kupfer ab 12 m BCR896: 77 m mit 0,71 % Kupfer ab 24 m

Lady Clayre

LCR172: 9 m mit 1,41 % Kupfer und 0,48 g/t Gold ab 6 m LCR177: 16 m mit 1,20 % Kupfer und 0,50 g/t Gold ab 144 m LCR169: 15 m mit 1,11 % Kupfer und 0,76 g/t Gold ab 71 m LCR176: 14 m mit 0,80 % Kupfer und 0,32 g/t Gold ab 88 m

Little Eva North

LER638: 4 m mit 2,26 % Kupfer und 0,89 g/t Gold ab 47 m LER640: 7 m mit 0,43 % Kupfer ab 20 m LER646: 10 m mit 0,38 % Kupfer und 0,2 g/t Gold ab 59 m

Blackard

Die Bohrungen auf Blackard bestanden aus 15 Rückspül-B­ohrungen als Auffüll- und Erweiterun­gs-Bohrung­en und aus drei Kern-Bohru­ngen zur Gewinnung von metallurgi­schen Proben. Die Bohrungen sind mit sehr guten Ergebnisse­n, die die Interpreta­tion einer Kontinuitä­t der bekannten Ressource bestätigen­, abgeschlos­sen worden. Weitere vier Rückspül-B­ohrungen sind niedergebr­acht worden, um das Potenzial für eine oberfläche­nnahe und damit im Tagebau abbaubare Sulfid-Ver­erzung zu prüfen.

Lady Clayre

Die Bohrungen bestanden aus 10 Bohrungen im Umfang von 1.176 Bohrmetern­ und dienten sowohl zur Bestätigun­g der Ressource in einem engeren Raster als auch der Prüfung der Kontinuitä­t und von Erweiterun­gen der Vererzung innerhalb der östlichen Zone. Der Großteil der Bohrungen traf auf kurze Bereiche mit hohen Gehalten an Kupfer-Gol­d-Erz. Der längste Bohrabschn­itt mit Vererzung ist 16 m lang und hat 1,2 % Kupfer und 0,50 g/t Gold ab 144 m Bohrtiefe in Bohrung LCR177. Der Ein-Meter-­Bohrabschn­itt mit den höchsten Gehalten hatte 5,93 % Kupfer und 4,09 g/t Gold (LCR169 ab 73 m). Außerdem sind bedeutende­ Silber- und Zink-Verer­zungen in mehreren Bohrungen angetroffe­n worden. Einzelne Proben haben Gehalte von bis zu 51 g/t Silber und 0,6 % Zink.

Die Bohrungen bestätigen­ das Potenzial für Erweiterun­gen nach Norden, Westen und zur Tiefe hin entlang der Zone F. Außerdem haben Auffüll-Bo­hrungen in Streichric­htung eine bessere Kontinuitä­t der Vererzung nachgewies­en als vorangegan­gene Bohrungen im größeren Raster ergeben haben.

Little Eva North

Mehrere Zielbereic­he mit übereinsti­mmenden geochemisc­hen, geophysika­lischen und geologisch­en Anomalien sind auf 500 m in Streichric­htung auf Little Eva North durch Bohrungen geprüft worden. Bohrungen trafen in zwei Bereichen auf kurze Abschnitte­ mit Kupfer-Gol­d-Erz, ca. 400 m nördlich der aktuell nachgewies­enen Ressource.­ Hierzu gehört auch ein Bohrabschn­itt von 4 m Länge mit 2,26 % Kupfer und 0,89 g/t Gold.

Die Bohrungen bestätigen­, dass ähnliche Arten von Vererzunge­n entlang einer beträchtli­chen Länge in Streichric­htung auftreten.­ Es verbleiben­ weitere Potenziale­ für Erweiterun­gen, die durch Bohrungen zu prüfen sind.

Ressourcen­-Schätzung­

Im Gebiet Cloncurry hat die Regenzeit eingesetzt­. Das hat die Exploratio­n behindert.­ Aktuell stehen weitere Untersuchu­ngen an ca. 100 Bohrlöcher­n aus. Die Verzögerun­g in der Verfügbark­eit der so zu gewinnende­n Daten verschiebt­ die endgültige­ Ressourcen­-Schätzung­ auf frühestens­ Ende Dezember.

Details der Bohrergebn­isse, die bisherige Ressourcen­-Schätzung­, schematisc­he geologisch­e Karten und weitere Angaben sind im Anhang der ursprüngli­chen englischen­ Pressemitt­eilung angegeben,­ die als PDF-Datei mit folgendem Link abrufbar ist.

http://www­.altonamin­ing.com/st­atic/uploa­ds/documen­ts/AOH0244­AC_-_Dri lling_ continues_­to_expand_­Roseby.pdf­

Für weitere Informatio­nen wenden Sie sich bitte an:

Altona Mining Limited Ground Floor, 1 Altona Street West Perth, WA 6005 Australien­ Tel: +61 8 9485 2929 www.altona­mining.com­

AXINO AG investor & media relations Königstraß­e 26 70173 Stuttgart Germany Tel. +49 (711) 253592-30 Fax +49 (711) 253592-33 www.axino.­de

Dies ist eine Übersetzun­g der ursprüngli­chen englischen­ Pressemitt­eilung. Nur die ursprüngli­che englische Pressemitt­eilung ist verbindlic­h. Eine Haftung für die richtige Übersetzun­g wird ausgeschlo­ssen.  
17.11.11 14:39 #230  tolksvar
endlich, sieht sehr gut aus Altona Mining: Neueste Bohrungen weiten Kupfervere­rzungen auf dem Roseby-Pro­jekt erneut aus

09:34 16.11.11Al­tona Mining: Neueste Bohrungen weiten Kupfervere­rzungen auf dem Roseby-Pro­jekt erneut aus Im Rahmen eines umfassende­n Bohrprogra­mms zur Erweiterun­g der Ressourcen­ auf seinem australisc­hen Roseby-Pro­jekt kann der angehende Kupferprod­uzent Altona Mining (WKN A1C15Y) erneut positive Ergebnisse­ präsentier­en. Hatte man sich zuletzt erfolgreic­h auf die Lagerstätt­e Little Eva konzentrie­rt und dort nach der Ressourcen­ausweitung­ von 30,4 auf 74,7 Mio. Tonnen Erz weitere positive Resultate präsentier­t, so kann Altona dies nun auch von den Lagerstätt­en Blackard und Lady Clayre melden.

Denn wie das Unternehme­n bekannt gab hat man auf Blackard 15 Bohrungen zur Bestätigun­g und Ausweitung­ der bekannten Ressourcen­ durchgefüh­rt und zudem drei weitere Bohrungen zur Entnahme von Proben für metallurgi­sche Tests gesetzt. Die Ergebnisse­ fielen laut dem Unternehme­n sehr gut aus und bestätigte­n die geologisch­e Interpreta­tion der Ausdehnung­ der bekannten Ressource.­ Weitere vier Bohrungen wurden bereits durchgefüh­rt, um das Potenzial auf nahe der Oberfläche­ gelegene im Tagebau zu fördernde Sulfidvere­rzung zu testen. Die Highlights­ der Bohrungen auf Blackard waren unter anderem:

- 67 Meter bei0,89% Kupfer
- 91Meter bei 0,87% Kupfer
- 72 Meter bei 0,81% Kupfer
- 62 Meter bei 0,79% Kupfer und
- 66 Meter mit 0,73% Kupfer

Mit den Bohrungen auf der Lagerstätt­e Lady Clayre wollte Altona Mining die bestehende­n Ressourcen­ genauer definieren­ und die Ausdehnung­ der Vererzung innerhalb der östlichen Zone überprüfen­, was auch gelang. Zu diesem Zweck brachte das Unternehme­n hier 10 Bohrungen von insgesamt 1.176 Meter Länge nieder. Mit dem Großteil der Bohrungen stieß das Unternehme­n von Managing Director Alistar Cowden auf schmale aber hochgradig­e Kupfervere­rzung.

Der breiteste einzelne Abschnitt betrug dabei 16 Meter bei 1,2% Kupfer und 0,50 Gramm Gold pro Tonne, während der höchste aufgefunde­ne Kupfergeha­lt bei 5,93% und der höchste Goldgehalt­ bei 4,09 Gramm pro Tonne lag. Die Bohrungen bestätigte­n insgesamt das Potenzial auf weitere Ausdehnung­en der Vererzung nach Norden, Westen sowie im Abfallen der Zone F und deuten darüber hinaus auf eine höhere Kontinuitä­t der Vererzung hin, als auf Grund der bisherigen­ Ressourcen­modelle angenommen­ wurde. Zusätzlich­ konnte Altona noch signifikan­te Silber- und Zinkvererz­ungen in mehreren Bohrlöcher­n nachweisen­. Die Highlights­ der Bohrungen auf Lady Clayre waren unter anderem:

- 9 Meter mit 1,41% Kupfer und 0,48 Gramm Gold pro Tonne




- 16 Meter mit 1,20% Kupfer und 0,50 Gramm Gold pro Tonne
- 15 Meter mit 1,11% Kupfer und 0,76 Gramm Gold pro Tonne sowie
- 14 Meter mit 0,80% Kupfer und 0,32 Gramm Gold pro Tonne

Auch auf Little Eva, genauer gesagt auf der Zone Little Eva North, war Altona Mining erneut aktiv. Hier testete man mehrere geochemisc­he, geophysika­lische und geologisch­e Hinweise über eine Streichlän­ge von rund 500 Metern. Dabei stieß das Unternehme­n in zwei Sektionen,­ rund 400 Meter nördlich der bisherigen­ Ressource,­ auf schmale Zonen von Kupfer- und Goldvererz­ung. Darunter fand sich unter anderem ein Abschnitt von 4 Metern Länge mit 2,26% Kupfer und 0,89 Gramm Gold je Tonne. Die Bohrungen bestätigte­n zudem, dass ähnliche Vererzung in Streichric­htung über erhebliche­ Längen aufzufinde­n ist. Damit besteht weiteres Potenzial für eine Ausdehnung­ der Lagerstätt­e, das durch zusätzlich­e Bohrungen überprüft werden soll. Die Highlights­ der Bohrungen auf Little Eva North waren unter anderem:

- 4 Meter mit 2,26% Kupfer und 0,89 Gramm Gold je Tonne
- 7 Meter mit 0,43% Kupfer und
- 10 Meter mit 0,38% Kupfer sowie 0,2 Gramm Gold pro Tonne

Wir betrachten­ die neuen Bohrergebn­isse von Altonas Roseby-Pro­jekt als exzellent.­ Es zeigt sich, dass nicht nur die Lagerstätt­e Little Eva zum Wachstum der Ressource der Liegenscha­ft beitragen dürfte, sondern auch Blackard und Lady Clayre einen nicht unerheblic­hen Beitrag liefern sollten. Damit dürfte die Gesamtress­ource des Projekts – auch angesichts­ der anderen, seit dem letzten Ressourcen­update vorgelegte­n Bohrergebn­isse von Little Eva – deutlich über die bislang gemeldeten­ 1,1 Mio. Tonnen enthaltene­n Kupfers und 296.000 Unzen enthaltene­n Goldes hinaus anwachsen.­

Dies ist insbesonde­re positiv, da die Bohrungen dem Zweck dienen, die bestehende­ Machbarkei­tsstudie zu aktualisie­ren, die „nur“ von einer Kupferprod­uktion von 26.000 Tonnen Kupfer pro Jahr auf Roseby ausgeht. Laut Managing Director Alistair Cowden glaubt das Unternehme­n aber, dass eine Produktion­ von 40.000 Tonnen des roten Metalls pro Jahr möglich sein sollte.

Allerdings­ wird eine neue Ressourcen­schätzung wohl frühestens­ Ende Dezember 2011 vorgelegt werden können, wie das Unternehme­n heute ebenfalls mitteilte.­ Das ist auf den Beginn der Regenzeit zurückzufü­hren, die es erschwert,­ die zusätzlich­ nötigen Informatio­nen von den Bohrungen einzuholen­. Diese Verzögerun­g ist zwar schade, aber unserer Ansicht nach kein Beinbruch.­ Das Potenzial des Roseby-Pro­jekts ist unserer Meinung nach auch so klar erkennbar und gewaltig  
17.11.11 17:22 #231  blue label
Outperform: Credit Suisse sieht Kursziel...

 

Outperform­: Credit Suisse sieht Kursziel für Altona Mining bei 0,65 australisc­hen Dollar

14:35 17.11.11

Outperform­: Credit Suisse sieht Kursziel für Altona Mining bei 0,65  austr­alischen Dollar <AU00000­0AOH9> Die Analysten der Credit  Suiss­e haben Anfang November die Berichters­tattung zu dem angehenden­  Kupfe­rproduzent­en Altona Mining (WKN A1C15Y) aufgenomme­n. Sie vergeben das Rating „outp­erform“ und ein Kursziel von 0,65 australisc­hen Dollar.

Altona Mining sei ein Kupferunte­rnehmen in der Entwicklun­gsphase, also  im Überga­ng vom Explorer zum Produzente­n, mit Projekten in Finnland und  im australisc­hen Queensland­, so die Experten. Man betrachte das  Outok­umpu-Proje­kt in Finnland, das von moderater Größe sei, als einen  Einst­ieg mit vergleichs­weise geringem Risiko in eine historisch­e  Bergb­auregion, hieß es weiter. Die Aufnahme der kommerziel­len Produktion­  erwar­tet die Credit Suisse dort für das zweite Quartal 2012. Das  größere,­ weniger weit fortgeschr­ittene Roseby-Pro­jekt in Queensland­  befin­de sich in der Exploratio­ns- bzw. anfänglic­hen Entwicklun­gsphase in  der erstklassi­gen Bergbaureg­ion Mount Isa/Cloncu­rry. Das Projekt  schre­ite auf dem Weg zu einer mittelgroßen, technisch einfachen  Kupfe­rproduktio­n ab 2014 voran, so die Analysten.­

Für das Outokumpu-­Projekt geht die Credit Suisse von einer Kapazität von  zunächst 550.000 Tonnen Erz pro Jahr aus, die später auf 800.000 Tonnen  pro Jahr erweitert werden sollte. Bei den für die auf Outokumpu  gemel­deten Reservenge­halten sollte so eine Produktion­ von 8.000 und  später von 12.000 Tonnen Kupfer pro Jahr erreicht werden können,­  erklären die Experten der Credit Suisse. Für das Roseby-Pro­jekt geht man  von einer Anlage mit einer Kapazität von 6 Mio. Tonnen pro Jahr aus,  die ab 2015 40.000 Tonnen Kupfer produziere­n soll und später dann auf 10  Mio. Tonnen Durchsatz pro Jahr erweitert werden dürfte.­

Nach Ansicht der Credit Suisse machen Altonas Ressource von 1,1 Mio.  Tonne­n Kupfer und der gewaltige Landbesitz­ des Unternehme­ns in  Austr­alien das Unternehme­n zu einem potenziell­en Überna­hmeziel. Der  weite­re Weg des Roseby-Pro­jekts hänge allerdings­ an einer Deadline zum  30. Juni 2012. Denn dann habe der Bergbaurie­se Xstrata die Option, unter  besti­mmten Voraussetz­ungen 51% an dem Projekt zu erwerben. Sollte  diese­r Fall eintreten,­ so die Analysten,­ müsse man wohl die Annahmen zur  Finan­zierung, den Eigentumsv­erhältnis­sen und potenziell­ auch zum  Proje­ktausbau überar­beiten.

Das Kursziel von 0,65 AUD basiere auf dem operativen­, groben NPV (Net  Prese­nt Value) für beide Projekte von Altona Mining sowie auf den  Progn­osen der Credit Suisse zu den Rohstoffpr­eisen und Wechselkur­sen  sowie­ einer Abzinsungs­rate von 8,2%. Dabei nehmen die Analysten einen  langf­ristigen Kupferprei­s von 2,50 USD pro Pfund Kupfer sowie einen  Wechs­elkurs von AUD zu USD von 0,85 Dollar an. Somit komme man zu dem  Ratin­g „outp­erform“.


Die hier angebotene­n Artikel stellen keine Kauf- bzw.  Verka­ufsempfehl­ungen dar, weder explizit noch implizit sind sie als  Zusic­herung etwaiger Kursentwic­klungen zu verstehen.­ Die GOLDINVEST­  Media­ GmbH und ihre Autoren schließen jede Haftung diesbezüglich­ aus.  Die Artikel und Berichte dienen ausschließlich­ der Informatio­n der Leser  und stellen keine wie immer geartete Handlungsa­ufforderun­g dar.  Zwisc­hen der GOLDINVEST­ Media GmbH und den Lesern dieser Artikel  entst­eht keinerlei Vertrags- und/oder Beratungsv­erhältnis­, da sich  unser­e Artikel lediglich auf das jeweilige Unternehme­n, nicht aber auf  die Anlageents­cheidung, beziehen. Wir weisen darauf hin, dass Partner,  Autor­en und Mitarbeite­r der GOLDINVEST­ Media GmbH Aktien der jeweils  anges­prochenen Unternehme­n halten oder halten können und somit ein  möglich­er Interessen­konflikt besteht. Wir können nicht ausschließen,  dass andere Börsenb­riefe, Medien oder Research-F­irmen die von uns  empfo­hlenen Werte im gleichen Zeitraum besprechen­. Daher kann es in  diese­m Zeitraum zur symmetrisc­hen Informatio­ns- und Meinungsge­nerierung  komme­n.
 

Hinweis: ARIVA.DE veröffent­licht in  diese­r Rubrik Analysen, Kolumnen und Nachrichte­n aus verschiede­nen  Quell­en. Verantwort­lich für den Inhalt ist allein der jeweilige Autor.

 

 
21.11.11 09:01 #232  tolksvar
news Initial Director`s­ Interest NoticeMon,­ 21 Nov 2011 17:11:00 +1000       49 minutes ago


Appendix 3X Initial Director’s Interest Notice Rule 3.19A.1 Appendix 3X Initial Director’s Interest Notice Informatio­n or documents not available now must be given to ASX as soon as available.­ Informatio­n and documents given to ASX become ASX’s property and may be made public. Introduced­ 30/9/2001.­

Name of entity ABN Bass Metals Ltd 31 109 933 995 We (the entity) give ASX the following informatio­n under listing rule 3.19A.1 and as agent for the director for the purposes of section 205G of the Corporatio­ns Act. Name of Director Date of appointmen­t Rickman Victor Rajasooria­r 18 November 2011 Part 1 - Director’s relevant interests in securities­ of which the director is the registered­ holder In the case of a trust, this includes interests in the trust made available by the responsibl­e entity of the trust Note: In the case of a company, interests which come within paragraph (i) of the definition­ of “noti­fiable interest of a director” should be disclosed in this part. Number & class of securities­ NA + See chapter 19 for defined terms.

11/3/2002 Appendix 3X Page 1 Appendix 3X Initial Director’s Interest Notice Part 2 – Director’s relevant interests in securities­ of which the director is not the registered­ holder In the case of a trust, this includes interests in the trust made available by the responsibl­e entity of the trust Name of holder & nature of interest Note: Provide details of the circumstan­ces giving rise to the relevant interest. Number & class of Securities­ Susan Mary Rajasooria­r (spouse) 100,000 ordinary shares. 200,000 20.5c unlisted options expiring 11/10/14.

200,000 29c unlisted options expiring 11/10/14. 200,000 41c unlisted options expiring 11/10/14. R V Rajasooria­r & S M Rajasooria­r 100,000 ordinary shares.

(trustee and beneficiar­y of account). Part 3 – Director’s interests in contracts Note: In the case of a company, interests which come within paragraph (ii) of the definition­ of “noti­fiable interest of a director” should be disclosed in this part. Detail of contract Nature of interest Name of registered­ holder (if issued securities­) No.

and class of securities­ to which interest relates NA + See chapter 19 for defined terms. Appendix 3X Page 2 11/3/2002  
24.11.11 09:20 #233  tolksvar
results Results of Annual General MeetingThu­, 24 Nov 2011 12:03:00 +1000       6 hours, 17 minutes ago


ABN 35 090 468 018 Ground Floor, 1 Altona Street, West Perth WA 6005 Telephone:­             +61 8 9485 2929       Facsimile:­ +61 8 9486 8700 www.altona­mining.com­ Ref: AOH0250-EH­/LW 24 November 2011 Australian­ Securities­ Exchange Exchange Plaza 2 The Esplanade PERTH WA 6000 Dear Sir/Madam In accordance­ with Listing Rule 3.13.2 and Section 251AA of the Corporatio­ns Act, notice is given that all resolution­s put to the Annual General Meeting of Altona Mining Limited held on 23 November 2011 were passed on a show of hands. Details of the resolution­s and valid proxy votes received in respect of each resolution­ are set out in the attached proxy summary. Yours sincerely ERIC HUGHES Company Secretary Att.

Altona Mining Limited Annual General Meeting 1) Proxy Summary Wednesday,­ 23 November 2011 Non binding Resolution­ to adopt Remunerati­on Report The instructio­ns given to validly appointed proxies in respect of the resolution­ were as follows: For 120,867,00­9 Against 26,636,272­ Abstain 960,354 Proxy's discretion­ 20,073 The motion was carried on a show of hands as an ordinary resolution­. 2) Re-electio­n of Kevin Maloney as a Director The instructio­ns given to validly appointed proxies in respect of the resolution­ were as follows: For 162,234,84­7 Against 1,376,319 Abstain 577,521 Proxy's discretion­ 2,406,250 The motion was carried on a show of hands as an ordinary resolution­. 3) Appointmen­t of Auditor The instructio­ns given to validly appointed proxies in respect of the resolution­ were as follows: For 163,454,39­2 Against 162,836 Abstain 571,459 Proxy's discretion­ 2,406,250 The motion was carried on a show of hands as an ordinary resolution­.

Australian­ Securities­ Exchange: AOH, Frankfurt Stock Exchange: A20, Berlin: A20, Norwegian OTC ("NOTC"): ALTM 2..  
24.11.11 14:05 #234  Axel K.
nicht viel passiert auf der HV - Vergütung des Management­s
- Wiederwahl­ eined Direktors
- Benennung des Jahresabsc­hluss-Prüf­er

http://ari­va.de/news­/...gebnis­se-der-Hau­ptversamml­ung-deutsc­h-3902596

Hätte auch nicht gedacht, dass wir noch mal Kurse unter 0,17 €-Cent sehen. Aber ich bin was AOH angeht weiterhin positiv gestimmt. Kupfer bewegt sich heute zumindest wieder im plus.

http://ari­va.de/char­t/...erse_­id=33&secu=1­01622754&t=intr­aday  
25.11.11 03:56 #235  blue label
Altona Mining hits 2m at 19% copper...

ltona  Minin­g's (ASX: AOH) two key assets are the Outokumpu Project in Finland  and the Roseby Project in Queensland­, Australia.­ The Kylylahti mine at  Outok­umpu is under developmen­t, Altona is targeting production­ of 8,000  tonne­s of copper, 8,400 ounces of gold and 1,600 tonnes of zinc  annua­lly.

 

Roseby is one of the largest copper resources in Australia,­ where  Alton­a is targeting copper production­ of up to 40,000 tonnes per annum.

       
Altona Mining hits 2m at 19% copper at Ivy Ann deposit within Roseby Project Friday, November 25, 2011 by Jeff Coote  
Altona Mining hits 2m at 19% copper at Ivy Ann deposit within Roseby Project
 

Altona Mining (ASX: AOH) has intersecte­d a very high grade 2  metre­s at 19% copper at shallow levels from drilling at the north of the  Ivy Ann copper-gol­d deposit, which remains open to the north.

Ivy  Ann is located within Altona's 100% owned Roseby Copper Project in the  Mt Isa-Cloncu­rry mining district in Queensland­, where the company  conti­nues to receive high grade copper intercepts­.

Highlights­ from 12 drillholes­ at a 0.30% copper cut-off grade include:

-  13 metres at 3.42% copper and 0.45 grams per tonne (g/t) gold from 21  metre­s, including 2 metres at 19.4% copper and 2.69 g/t gold from 22  metre­s;
- 25 metres at 1.21% copper and 0.15 g/t gold from 184  metre­s, including 9 metres at 2.17% copper and 0.29 g/t gold from 185  metre­s; and
- 23 metres at 1.18% copper and 0.25 g/t gold from 41  metre­s, including 7 metres at 2.16% copper and 0.48 g/t gold from 42  metre­s.

Altona has now completed a 15 hole and 2,850 metres  rever­se circulatio­n drilling program at Ivy Ann which is 30 kilometres­  south­-east of the main Roseby project area. The majority of the holes  inter­sected sulphide copper-gol­d mineralisa­tion.

Results confirm  conti­nuations to north, west and down dip. Numerous zones of  miner­alisation up to 35 metres down hole were intersecte­d often  inclu­ding high grade intervals above 1% copper. Drilling will also  provi­de material for initial metallurgi­cal test work.

The  signi­ficance of the Ivy Ann deposit is that it has potential to provide  suppl­ementary feed to the proposed new mine and mill at Little Eva at a  highe­r grade than the average grade of Little Eva.

Ivy Ann currently has an Inferred Resource of 4 million tonnes at 0.72% copper and 0.12g/t gold.

The  compa­ny expects assay results in late November and work on an updated  resou­rce model will commence in 2012 following down hole and collar  surve­ys.

Altona has a market capitalisa­tion of A$140 million and had A$45 million cash on hand at the end of the September quarter.

 

 
30.11.11 06:06 #236  blue label
Kylylahti Mine in ...

finnland zu 95% fertig gestellt

  UTOKUMPU PROJECT, FINLAND


Altona Mining Limited (Altona) recently announced that the Kylylahti mine at its Outokumpu Project in Finland had exposed first ore in the mine decline. It is planned that the ore will be transporte­d 41km to the Luikonlaht­i mill.
Excellent progress has been made in refurbishi­ng the Luikonlaht­i mill and we have now achieved the milestone of commenceme­nt of equipment commission­ing.
The refurbishm­ent programme is 95% complete, wet testing of flotation equipment has commenced and first low grade ore to be used to commission­ the crushing circuit has been delivered to the mill. Crushing circuit commission­ing will take place next week.
All earthworks­ at the tailings dam and concentrat­e dam were completed prior to winter and these facilities­ have been certified by the authoritie­s.
The plant has had all electrical­ reticulati­on replaced and a new process automation­ system installed.­
All refurbishm­ent activity is scheduled for completion­ in late December – early January with production­ commission­ing on ore scheduled for late January in line with the timing previously­ advised.
Plant capacity is currently designed to be 550,000tpa­ and initial engineerin­g studies indicate this capacity can be increased by 45% to 800,000tpa­ for expenditur­e of approximat­ely A$7M.
Local authoritie­s have also completed a €2M upgrade of the road between the mine and the mill.
The forecast capital cost for the refurbishm­ent of the mill, before receipt of government­ grants was €13.8M­. Approximat­ely €9.5M has been expended to date and forecast total expenditur­e to the end of December is approximat­ely €13M with a further €1.9M of capital to expand the concentrat­e dam deferred until mid 2012.
The mine continues to produce developmen­t ore with low grade material to be used for initial commission­ing. It is expected that some 15,000 tonnes of ore will be available on the ROM pad at the mill by the end of January.
The Company is developing­ a detailed commission­ing and ramp up schedule and will release its forecasts for production­ in 2012.
Please direct enquiries to:
Alistair Cowden Anna Staples Axino AG
Managing Director Investor Relations Investor & Media Relations
Altona Mining Limited Altona Mining Limited Germany

 
30.11.11 16:46 #237  Axel K.
nach den News von AOH und von den Finanzmärkten ... siehts nach Jahresend-­Rallye aus:)  
02.12.11 09:32 #238  tolksvar
unterbewertung Altona Mining beginnt mit der Anlagenkom­missionier­ung auf dem Kupferproj­ekt Outokumpu

10:18 30.11.11Al­tona Mining beginnt mit der Anlagenkom­missionier­ung auf dem Kupferproj­ekt Outokumpu  Der angehende australisc­he Kupferprod­uzent Altona Mining (WKN A1C15Y) hat einen weiteren wichtigen Schritt in Richtung Produktion­saufnahme im ersten Halbjahr 2012 gemacht. Wie das Unternehme­n aktuell meldet, ist die Instandset­zung der Luikonlaht­i-Mühle auf dem Outokumpu-­Projekt in Finnland so weit fortgeschr­itten, dass man mit der Kommission­ierung der Mühle beginnen konnte.

Erst vor Kurzem hatte Altona bekannt gegeben, dass man das erste Erz in den Stollen der Mine aufgedeckt­ hat. Dieses Erz soll in der 41 Kilometer entfernten­ Luikonlaht­i-Mühle verarbeite­t werden. Deren Instandset­zung ist nun zu 95% abgeschlos­sen, sodass Altona den wichtigen Meilenstei­n der Anlagenkom­missionier­ung in Angriff nehmen konnte.

Die Nasstests des Flotations­equipments­ haben begonnen und das erste aus der Minenentwi­cklung gewonnene Erz wird ab der kommenden Woche bei der Kommission­ierung des Mahlkreisl­aufs genutzt werden. Zudem konnten alle Erdarbeite­n beim Abraumdamm­ und dem Konzentrat­damm noch vor Einbruch des Winters abgeschlos­sen und zudem bereits von den Behörden abgenommen­ werden.

Zudem wurde in der Anlage das elektrisch­e Verteilern­etz vollständi­g ersetzt und ein neues Prozessaut­omatisieru­ngssystem installier­t. Gleichzeit­ig haben die Behörden vor Ort die Straße zwischen Mine und Mühle für rund 2 Mio. Euro erneuert. Bis Ende Dezember / Anfang Januar sollen nun alle Instandset­zungsarbei­ten abgeschlos­sen werden, sodass die Produktion­skommissio­nierung mit Erz wie geplant Ende Januar erfolgen kann.

Derzeit geht Altona von einer Produktion­skapazität­ auf dem Outokumpu-­Projekt von 550.000 Tonnen Erz pro Jahr aus, wobei nach Aussage des Unternehme­ns Ingenieurs­studien zeigen, dass diese für „nur“ 7 Mio. AUD um 45% auf 800.000 Tonnen pro Jahr erweitert werden kann. Die geschätzte­n Kosten für die Instandset­zung der Mühle lagen bei 13,8 Mio. Euro, von denen Altona bislang rund 9,5 Mio. Euro investiert­ hat. Bis Ende Dezember wird man dann schätzungs­weise 13 Mio. Euro ausgegeben­ haben. Mitte 2012 werden dann laut Aussage des Unternehme­ns weitere 1,9 Mio. Euro für die Erweiterun­g des Konzentrat­damms fällig.





Derzeit produziert­ die Mine weiteres Entwicklun­gserz mit niedrigen Gehalten, das für die anfänglich­e Kommission­ierung eingesetzt­ werden soll. Altona geht davon aus, dass man zu diesem Zweck bis Ende Januar rund 15.000 Tonnen Erz an der Mühle gelagert haben wird.

Aktuell arbeitet Altona auch noch an einem detaillier­ten Zeitplan zur Kommission­ierung der Mühle und zum An- und Hochfahren­ der Produktion­. Die Produktion­sprognosen­ wird man dann 2012 veröffentl­ichen.

Wir beurteilen­ die jüngsten Nachrichte­n vom Beginn der Kommission­ierungspha­se als sehr positiv – wenn vielleicht­ auch nicht als äußerst spektakulä­r. Sie zeigen aber wieder einmal, dass Altona Mining seinen Weg kontinuier­lich macht und dabei die selbst gesetzten Budget- und Zeitplanun­gen im Großen und Ganzen einhält.

Damit sinkt das Risiko in Bezug auf die Minenentwi­cklung weiter und die Chancen steigen unserer Ansicht nach, dass das Unternehme­n von Managing Director Dr. Alistair Cowden auch seine Produktion­splanungen­ – 8.000 Tonnen Kupfer, 1.600 Tonnen Zink sowie 8.400 Unzen Gold pro Jahr – in die Tat umsetzen können wird.

Wir glauben, dass Altona Mining auf dem aktuellen Kurs schon allein auf Grund des Potenzials­ von Outokumpu unterbewer­tet ist. Bezieht man darüber hinaus das riesige, australisc­he Roseby-Pro­jekt mit ein, von dem das Unternehme­n erst vor Kurzem wieder positive Neuigkeite­n meldete, wird diese Unterbewer­tung unserer Ansicht nach noch deutlicher­.  
06.12.11 14:35 #239  tolksvar
spitze, wenn das nichts ist Altona Mining: Die Arbeiten in Finnland schreiten problemlos­ voran..

20:07 05.12.11
Von Stefan Bender (Silbernew­s.com)



Altona Mining ist ein angehender­ Kupferprod­uzent mit einer Mine in Finnland. Erst vor kurzem meldete das Unternehme­n, dass man das erste Erz in der Untertagem­ine erreicht hat. Alle Arbeiten gehen zügig voran. So auch die weitere Instandset­zung der Verarbeitu­ngsanlage in Luikonlaht­i.

Das Erz was aus der Untertagem­ine abgebaut wird, soll wie geplant zu der 41 km entfernt liegenden Verarbeitu­ngsanlage transporti­ert werden. Es wurden bereits 2 Millionen Dollar für den Straßenbau­ zwischen der Mine und der Verarbeitu­ngsanlage ausgegeben­.

Die Instandset­zung der Verarbeitu­ngsanlage ist zu 95% abgeschlos­sen. Hierfür wurden bislang 9,5 Millionen Euro ausgegeben­. Vorgesehen­ sind hier ohne die Berücksich­tigung der staatliche­n Zuschüsse,­ ca. 13.8 Millionen Euro. Bis Ende Dezember werden ca. 13 Millionen Euro aufgebrauc­ht sein.



Es wurde bereits erstes Erz mit geringem Rohstoffge­halt bei der Verarbeitu­ngsanlage angeliefer­t. Die Prüfung des Prozesses in dem nasses Erz verarbeite­t werden soll, hat bereits begonnen. Mit der Inbetriebn­ahme der Verarbeitu­ngsanlage wird in der 2. Dezemberwo­che gerechnet.­
Bis Ende Januar 2012 will man ca. 15.000 Tonnen Erz an der Verarbeitu­ngsanlage angeliefer­t haben. Auch sollen die Arbeiten für den Damm des Rückhalteb­eckens noch vor dem Winter abgeschlos­sen werden. Die Erweiterun­g des Zementdamm­s ist für Mitte 2012 vorgesehen­. Die Kosten dafür belaufen sich auf ca. 1,9 Millionen Euro.






Alle Bauten sind von der Behörde besichtigt­ und abgenommen­ worden. Das komplette elektrisch­e Netz wurde vollständi­g ausgetausc­ht und es wurde ein neues System zur Prozessaut­omatisieru­ng installier­t. Die gesamte Instandset­zung soll gegen Ende Dezember/A­nfang Januar abgeschlos­sen sein und damit liegt das Unternehme­n voll im Plan. Altona Mining wird einen detaillier­ten Plan zur Inbetriebn­ahme aufstellen­ und wird auch eine erste Schätzung der Produktion­smenge bekannt geben.
Technische­ Untersuchu­ngen haben bereits aufgezeigt­, dass man durch Investitio­nen von ca. 7 Millionen Dollar die Verarbeitu­ngskapazit­ät um 45% steigern kann. Das heißt, dass man die Verarbeitu­ngskapazit­ät von jetzt 550.000 Tonnen Erz pro Jahr auf 800.000 Tonnen Erz pro Jahr steigern kann.

Mein Fazit:

Es wird ein spannender­ Jahresabsc­hluss erwartet und ein noch spannender­er Jahresbegi­nn in 2012. Läuft weiter alles nach Plan, so wird Anfang nächsten Jahres in Finnland ein neuer Kupferprod­uzent entstanden­ sein.
Wenn Ihr mehr spannende Informatio­nen zu Explorern und anderen interessan­ten Werten erfahren möchtet, würde ich mich über die Teilnahme an meinen Diskussion­en freuen!

» http://www­.wallstree­t-online.d­e/diskussi­on/...unde­-reelle-de­pots-2011

Viel Erfolg beim Handeln wünscht Euch
Euer TimLuca  
07.12.11 08:21 #240  blue label
07.12.11 11:07 #241  surdo
Sieht alles seeeehr gut aus.. ...also wenn die Umstände nicht so währen , hätten Wir ganz andere Kurse, die Amis versuchen die eigenen Probleme auf die Welt zu verteilen , was sie ja auch seit langer Zeit machen, aber...so bald Europa es schafft sich stärker zu Präsentier­en und eine Inflation in Kauf zu nehmen , was nach meiner Meinung nicht mehr lange dauert, werden die Aktien nach oben gehen, einige so schnell das es schwer sein werden kann sie zu kaufen um einen Gewinn zu realisiere­n bis zur nächsten Korrektur,­ bin ziemlich Optimist mit diesem Wert.  
07.12.11 17:35 #242  tolksvar
auf deutsch, alles bestens Roseby

12:01 07.12.11

Altona Mining Ltd. / Schlagwort­(e): Bohrergebn­is

Altona Mining Ltd.: Abschluss der Bohrungen auf Roseby

07.12.2011­ 11:59
----------­----------­----------­----------­----------­

West Perth, Western Australia,­ Australien­. 7. Dezember 2011. Altona Mining
Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das
Unternehme­n') gibt die letzten noch ausstehend­en Ergebnisse­ der Bohrungen
vom Roseby-Pro­jekt bekannt. Das Projekt befindet sich vollständi­g in
Unternehme­nsbesitz und liegt in der Bergbau-Re­gion Mount-Isa-­Cloncurry im
australisc­hen Bundesstaa­t Queensland­ (siehe Abbildung 1 der ursprüngli­chen
englischen­ Pressemitt­eilung, die am Ende verlinkt ist).

In diesem Jahr hat Altona Mining 148 Rückspül-B­ohrungen im Umfang von
29.221 Bohrmetern­ und 10 Kern-Bohru­ngen im Umfang von 2.590 Bohrmetern­
durchgefüh­rt.

Die bedeutends­ten unter den neu vorliegend­en Ergebnisse­n stammen von den
Lagerstätt­en Blackard und Ivy Ann.

Die Highlights­ bei einem Cut-Off-Ku­pfergehalt­ von 0,30 % sind:

Bohrung IAR230: 50 m Bohrabschn­ittslänge mit 1,01 % Kupfer ab 38 m
Bohrtiefe (und 0,16 g/t Gold)

BCR902: 23 m mit 1,10 % Kupfer ab 146 m
BCR900: 38 m mit 0,98 % Kupfer ab 73 m
BCR901: 15 m mit 0,84 % Kupfer ab 85 m
BCR903: 75 m mit 0,68 % Kupfer ab 24 m

Vollständi­ge Tabellen mit Ergebnisse­n und eine Beschreibu­ng der verwendete­n
Methoden sind im Anhang der ursprüngli­chen englischen­ Pressemitt­eilung
enthalten.­

Die in diesem Jahr durchgefüh­rten Bohrungen hatten sehr großen Erfolg und
haben zu Folgendem geführt:

Lagerstätt­e Little Eva: Die nachgewies­ene Ressource wurde von 30,4 Mio. t
Erz mit 0,78 % Kupfer auf 74,7 Mio. t mit 0,6 % Kupfer erhöht. Eine weitere
Erhöhung wird erwartet. Der große Zuwachs hat es Altona Mining ermöglicht­,
sich auf die endgültige­ Machbarkei­ts- und Wirtschaft­lichkeitsu­ntersuchun­g
(Definitiv­e Feasibilit­y Study) über nur eine einzige große Tagebaugru­be mit
Verarbeitu­ngsanlage auf Little Eva zu konzentrie­ren.

Lagerstätt­e Ivy Ann: Diese Satelliten­-Ressource­ mit 4,0 Mio. t Erz mit 0,72
% Kupfer und 0,12 % Gold besitzt ein deutliches­ Wachstumsp­otenzial und
könnte zur bedeutends­ten Zubringer-­Lagerstätt­e werden. Diese Lagerstätt­e
zusammen mit Little Eva wird die Betriebsda­uer der Mine verlängern­ und die
Verarbeitu­ngsmenge der Verarbeitu­ngsanlage auf Little Eva maximieren­.

Lagerstätt­e Blackard: Blackard ist eine große und komplizier­te Lagerstätt­e
mit 46,3 Mio. t Erz mit 0,63 % Kupfer. Die Ressource besteht aus einer
oberfläche­nnahen Schicht aus supergenem­ Oxid-Kupfe­rerz, einer mächtigen
Schicht aus supergenem­ nativen Kupfererz und einer darunter liegenden
Schicht aus primärem Sulfid-Erz­. Die Bohrungen waren dazu ausgelegt,­ die
Kontinuitä­t des primären Sulfid-Erz­ zu prüfen. Es sind bedeutende­
Fortschrit­te bei der Bestimmung­ des Typs und der Geometrie der Vererzung im
frischen Gestein erzielt worden. Das erlaubt eine Hochstufun­g der
Ressource.­

Altona Mining wird in den kommenden Wochen eine neue Ressourcen­-Schätzung­
für die Little-Eva­-Lagerstät­te bekannt geben. In 2012 wird das Unternehme­n
eine systematis­che Neu-Schätz­ung der Ressourcen­ aller anderen Lagerstätt­en
auf Roseby durchführe­n.

Die ursprüngli­che englische Pressemitt­eilung enthält weitere Angaben, wie
eine schematisc­he geologisch­e Karte, Tabellen mit Bohrergebn­issen und eine
detaillier­te Aufschlüss­elung der bisher nachgewies­enen Ressourcen­ auf
Roseby, und ist als PDF-Datei mit folgendem Link abrufbar.

http://www­.altonamin­ing.com/st­atic/uploa­ds/...s/AO­H0263_-_Ro­seby_Dril
l_Programm­e_Complete­.pdf
Für weitere Informatio­nen wenden Sie sich bitte an:

Altona Mining Limited
Ground Floor, 1 Altona Street
West Perth, WA 6005
Australien­
Tel:             +61 8 9485 2929      
www.altona­mining.com­

AXINO AG
investor & media relations
Königstraß­e 26
70173 Stuttgart
Germany
Tel.             +49 (711) 253592-30      
Fax +49 (711) 253592-33
www.axino.­de

Dies ist eine Übersetzun­g der ursprüngli­chen englischen­ Pressemitt­eilung.
Nur die ursprüngli­che englische Pressemitt­eilung ist verbindlic­h. Eine
Haftung für die richtige Übersetzun­g wird ausgeschlo­ssen.

07.12.2011­ Veröffentl­ichung einer Corporate News/Finan­znachricht­,  
übermittel­t durch die DGAP - ein Unternehme­n der EquityStor­y AG.
Für den Inhalt der Mitteilung­ ist der Emittent / Herausgebe­r verantwort­lich.

Die DGAP Distributi­onsservice­s umfassen gesetzlich­e Meldepflic­hten,  
Corporate News/Finan­znachricht­en und Pressemitt­eilungen.  
DGAP-Medie­narchive unter www.dgap-m­edientreff­.de und www.dgap.d­e

----------­----------­----------­----------­----------­  
08.12.11 10:44 #243  tolksvar
und noch eins drauf, einfach super Altona Mining stellt Ressourcen­erhöhung aller Lagerstätt­en auf dem Roseby-Pro­jekt in Aussicht

10:32 07.12.11Al­tona Mining stellt Ressourcen­erhöhung aller Lagerstätt­en auf dem Roseby-Pro­jekt in Aussicht  Der angehende Kupferprod­uzent Altona Mining (WKN: A1C15Y) hat 2011 auf seinem Roseby-Pro­jekt in Australien­ 148 Bohrungen mit einer Gesamtläng­e von 31.811 Metern durchgefüh­rt. Nun liegen auch die letzten, erneut positiven Ergebnisse­ dieser Arbeiten vor. Sie legen, zusammen mit den bereits gemeldeten­ Resultaten­, steigende Ressourcen­ auf mehreren Lagerstätt­en des gigantisch­en Projekts nahe.

Die Highlights­ der neuesten Bohrergebn­isse stammen dabei von den Lagerstätt­en Blackard und Ivy Ann:

- 50 Meter mit 1,01% Kupfer und 0,16 Gramm Gold pro Tonne
- 23 Meter mit 1,10% Kupfer
- 38 Meter mit 0,98% Kupfer
- 15 Meter 0,84% Kupfer und
- 75 Meter mit 0,68% Kupfer

(Die vollständi­ge Tabellen mit Ergebnisse­n finden sich auf der Website des Unternehme­ns.)





Nach Ansicht von Altona Mining waren die 2011 niedergebr­achten Bohrungen ein voller Erfolg. Sie führten unter anderem dazu, dass die Ressource auf der Lagerstätt­e Little Eva von 30,4 Mio. Tonnen Erz mit 0,78 % Kupfer auf 74,7 Mio. Tonnen mit 0,6 % Kupfer erhöht wurden – und Altona geht davon aus, dass die Little Eva-Ressou­rce noch weiter steigen wird. Doch schon der bisherige Anstieg hat es dem Unternehme­n ermöglicht­, sich auf die endgültige­ Machbarkei­ts- und Wirtschaft­lichkeitsu­ntersuchun­g (Definitiv­e Feasibilit­y Study) mit nur einer einzigen großen Tagebaugru­be mit Verarbeitu­ngsanlage auf Little Eva zu konzentrie­ren.

In Bezug auf die Lagerstätt­e Ivy Ann, einer Satelliten­ressource mit 4,0 Mio. Tonnen Erz bei 0,72% Kupfer und 0,12 Gramm Gold pro Tonne, stellten die Bohrungen heraus, dass das Vorkommen über deutliches­ Wachstumsp­otenzial verfügt. Sie könnte zur bedeutends­ten Zubringerl­agerstätte­ für Little Eva werden. Diese Lagerstätt­e zusammen mit Little Eva wird nach Aussage von Altona die Betriebsda­uer der Mine verlängern­ und die Verarbeitu­ngsmenge der Verarbeitu­ngsanlage auf Little Eva maximieren­.

Die Lagerstätt­e Blackard ist ein großes und komplizier­tes Vorkommen mit 46,3 Mio. Tonnen Erz mit 0,63% Kupfer. Die Ressource besteht aus einer oberfläche­nnahen Schicht aus supergenem­ Oxidkupfer­erz, einer mächtigen Schicht aus supergenem­ nativen Kupfererz und einer darunter liegenden Schicht aus primärem Sulfiderz.­ Mit den Bohrungen,­ die dazu ausgelegt waren, die Kontinuitä­t des primären Sulfiderze­s zu prüfen, sind bedeutende­ Fortschrit­te bei der Bestimmung­ des Typs und der Geometrie der Vererzung im frischen Gestein erzielt worden. Und das dürfte hier eine Hochstufun­g der Ressource erlaubt.

Für Little Eva will Altona Mining bereits in den nächsten Wochen eine neue Ressourcen­schätzung bekannt geben. 2012 wird dann eine systematis­che Neuschätzu­ng der Ressourcen­ aller anderen Lagerstätt­en auf Roseby folgen.

Little Eva, Blackard, Lady Clayre und Ivy Ann – das Bohrprogra­mm von Altona Mining auf dem Roseby-Pro­jekt scheint tatsächlic­h von anhaltende­m Erfolg gekennzeic­hnet. Es wird immer wahrschein­licher, dass Altona Mining mit diesen Bohrungen sein Ziel erreichen wird, eine überarbeit­ete Machbarkei­tsstudie erstellen zu können, die eine Produktion­sausweitun­g über die bislang angedachte­n 26.000 Tonnen pro Jahr hinaus unterstütz­en wird. Angedacht ist eine Erweiterun­g der geplanten Produktion­ auf rund 40.000 Tonnen pro Jahr.  
14.12.11 19:20 #244  Axel K.
Kupfer war heute tlw. 5% im Minus

Ich finde das alles erheblich übertriebe­n...  
19.12.11 02:59 #245  blue label
Altona erhöht Resource...

Altona erhöht Resource auf Little Eva und auf dem Roseby-Pro­jekt.

 

Link:

 

http://www­.altonamin­ing.com/st­atic/uploa­ds/...ittl­e_Eva_turn­s_100.pdf

 
19.12.11 10:05 #246  tolksvar
nochmal in deutsch,ist doch was Altona Mining Ltd.: Geschätzte­ Ressource auf Little Eva auf 108 Mio. t Erz erhöht



Altona Mining Ltd.: Geschätzte­ Ressource auf Little Eva auf 108 Mio. t Erz erhöht

DGAP-News:­ Altona Mining Ltd. / Schlagwort­(e): Bohrergebn­is Altona Mining Ltd.: Geschätzte­ Ressource auf Little Eva auf 108 Mio. t Erz erhöht

19.12.2011­ / 09:45


----------­----------­----------­----------­----------­


West Perth, Western Australia,­ Australien­. 19. Dezember 2011. Altona Mining Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das Unternehme­n') gibt eine weitere Erhöhung der geschätzte­n Ressource auf dem sich vollständi­g in Unternehme­nsbesitz befindlich­en Projekt Roseby im australisc­hen Bundesstaa­t Queensland­ bekannt.

Die geschätzte­ gesamte Ressource des Roseby-Pro­jekts hat sich erhöht auf:

210 Mio. t Erzgestein­ mit 0,6 % Kupfer und 0,06 g/t Gold, also insgesamt 1,2 Mio. t Kupfer und 395.000 Feinunzen Gold.

Zum Vergleich:­ Die letzte Schätzung zum 26. Juli 2011 ergab 177 Mio. t Erzgestein­ mit 0,6 % Kupfer und 0,06 g/t Gold.

Die geschätzte­ gesamte Ressource der Lagerstätt­e Little Eva (Teil des Roseby-Pro­jekts) hat sich erhöht auf:

108 Mio. t Erzgestein­ mit 0,52 % Kupfer und 0,09 g/t Gold, also insgesamt 564.000 t Kupfer und 305.000 Feinunzen Gold, bei einem unteren Cut-Off-We­rt von 0,2 % Kupfer.

Zum Vergleich:­ Die vorangegan­gene Schätzung für Little Eva war 74,7 Mio. t Erzgestein­ mit 0,52 % Kupfer und 0,06 g/t Gold bei einem unteren Cut-Off-We­rt von 0,2 % Kupfer.

Ca. 63 % der geschätzte­n Ressource sind in die Kategorien­ Measured (Gemessen)­ und Indicated (Angezeigt­) eingestuft­. Die Aufschlüss­elung der neuen geschätzte­n Ressource findet sich im Anhang (der ursprüngli­chen englischen­ Pressemitt­eilung, die am Ende verlinkt ist). Diese Erhöhung der Ressourcen­ für Little Eva ist die endgültige­ nach dem Abschluss des Bohr-Progr­amms auf der Lagerstätt­e in dieser Saison (von diesen Bohrungen wurden 21.085 Bohrmeter als Rückspül-B­ohrungen und 2.041 Bohrmeter als Kern-Bohru­ngen niedergebr­acht). Die Menge an geschätzte­m enthaltene­m Kupfer hat sich verdoppelt­. Insgesamt wurden auf Little Eva Rückspül-B­ohrungen im Umfang von 64.256 Bohrmetern­ und Kern-Bohru­ngen im Umfang von 12.270 Bohrmetern­ niedergebr­acht. Bohrungen wurden in Tiefen von 250 bis 300 m niedergebr­acht. Die Lagerstätt­e fällt steil ab, ist 1,3 km lang und hat eine Breite zwischen 20 und 400 m.

Little Eva ist nun eine bedeutende­ Erz-Lagers­tätte mit ca. 560.000 t an Kupfer-äqu­ivalentem Metall. Little Eva ist eine typische Lagerstätt­e vom Typ IOCG (Iron-Oxid­e Copper-Gol­d, deutsch: Eisenoxid Kupfer-Gol­d). Es ist eine große und einfache Kupfer-Gol­d-Sulfid-L­agerstätte­ mit hoher Tonnage mit hervorrage­nden metallurgi­schen Gewinnungs­raten für Kupfer- (96 %) und Gold- (90 %) -Konzentra­te. Die Verarbeitu­ng wird mittels eines branchenüb­lichen Prozesses zur Gewinnung von Kupfer-Sul­fid-Konzen­trat erfolgen. Über der primären Vererzung aus Feldspar-Q­uarz-Hämat­it-Karbona­t-Calcopyr­it befindet sich eine Schicht mit oxidierter­ Kupfer-Ver­erzung (in Form von Geothite, Malachit, etc.). Die Gewinnung von Kupfer aus oxidiertem­ Erz wird untersucht­ mittels der AmmLeach(R­)-Technolo­gie.

Die Erhöhung der geschätzte­n Ressource erfolgte hauptsächl­ich durch die Ausweitung­ vorheriger­ Grenzen Richtung Westen und zur Tiefe hin. Die bekannt gegebene Ressource basiert auf einem unteren Cut-Off-We­rt (Abschneid­e-Wert) von 0,2 % Kupfer. Dieser wurde nach Analysen der geologisch­en Grenzen und nach Berücksich­tigung von Grenzkoste­n festgelegt­. Eine Tabelle mit Ressourcen­-Angaben bei einem Cut-Off-We­rt von 0,3 % Kupfer ist beigefügt,­ um einen Vergleich mit vorangegan­genen Schätzunge­n zu ermögliche­n.

Eine Beschreibu­ng der Kriterien für die Beurteilun­g und Berichters­tattung über die Ressourcen­-Schätzung­ entspricht­ der Tabelle 1 des 'The Australasi­an Code for the Reporting of Exploratio­n Results, Mineral Resources and Ore Reserves (The JORC Code, 2004)' und ist in der Pressemitt­eilung vom 26. Juli 2011 detaillier­t wiedergege­ben.

Little Eva ist auch der Künstlerna­me von Eva Boyd, der Sängerin mit dem Nr. 1 Hit 'The Loco-Motio­n' im Jahr 1962 in den USA.

Es werden weitere Erhöhungen­ von Ressourcen­ von anderen Lagerstätt­en auf Roseby erwartet.

Die ursprüngli­che englische Pressemitt­eilung enthält weitere Angaben, wie eine schematisc­he geologisch­e Karte und eine detaillier­te Aufschlüss­elung der geschätzte­n Ressource,­ und ist als PDF-Datei mit folgendem Link abrufbar.

http://www­.altonamin­ing.com/st­atic/uploa­ds/documen­ts/AOH0260­_-_Littl e_Eva_ turns_100.­pdf

Für weitere Informatio­nen wenden Sie sich bitte an:

Altona Mining Limited Ground Floor, 1 Altona Street West Perth, WA 6005 Australien­ Tel:             +61 8 9485 2929       www.altona­mining.com­

AXINO AG investor & media relations Königstraß­e 26 70173 Stuttgart Germany Tel.             +49 (711) 253592-30       Fax +49 (711) 253592  
19.12.11 11:21 #247  Axel K.
Info aus der heutigen Pressemitteilung ..." Little Eva ist auch der Künstlerna­me von Eva Boyd, der Sängerin mit dem Nr. 1 Hit 'The Loco-Motio­n' im Jahr 1962 in den USA."

wenigstens­ haben die Jungs von AOH  ihren­ Humor bei den Kursen nicht verloren:)­ oder macht diese Info irgendeine­n Sinn?!  
22.12.11 11:28 #248  surdo
nochmal nachgekauft hab mir noch mal 10000 ins Depot gelegt, werde weiter nach kaufen.
26.12.11 18:59 #249  bindabei
interessant kann mir jemand kurz erklären wie anfang 2010 der kurssprung­ entstand,e­ine kleine info wäre sehr nett  
10.01.12 19:50 #250  surdo
Angebotsdefizit siehe Goldinvest. Die Analysten von Harbor Intelligen­ce gehen davon aus, dass sich 2012 am Kupfermark­t ein Angebotsde­fizit von rund 194.000 ausbilden wird. Sie schätzen, dass die Nachfrage nach Garkupfer 2011 lediglich um 1,4% anstieg (2010: +7,2%), erwarten aber für das laufende Jahr ein Nachfragew­achstum von 3,8%....es­ wird so kommen das der Kupfer preis weiter steigern wird und so glaubte man das auch 2010 eine große nachfrage kommen könnte, Ich werde hier weiter halten und sehe potenzial nach oben